GOLDING CONTRACTORS PTY LTD contracted Xtreme Engineering Pty Ltd for the construction of the Marine Operations Terminal structural steel fabrication and installation. The project took place at Alf Orourke Drive in Gladstone, QLD.

Xtreme Engineering fabricated and installed over 50t of steelwork for the project including:

Z
Detailed drafting of designed steelwork for fabrication
Z
Procurement and supply of the grade 450 steelwork and fixings
Z
Fabrication, testing, and transport of structural steelwork
Z
Protective coating of the structural steelwork within a state of the art blast and paint facility
Z
Installation of structural steelwork with a 110t pin jib crawler crane

The project was successfully completed in 6 weeks with the highest level of safety and quality maintained for Golding.  The facility looks fantastic and is set for operation in April 2017. Xtreme Engineering fabricated and installed over 50t of steelwork for the project.